SCI-MHVAC-CASE-003

Corrosion and Leak Assessment

Sunseeker 73 ft | Dometic three-chiller chilled-water system

Technical evidence from the inspection
Strip inspection and leak confirmation required

ASSESSMENT

Saltwater exposure, advanced corrosion, condenser fouling and suspected refrigerant leakage affected several connected systems. The inspection defined what could be serviced in place and what required controlled removal.

The correct next step was containment and confirmation: control the saltwater source, remove the most damaged chiller for inspection, and leak-test the remaining circuits before any recharge or repair-versus-replacement decision.

3
Chiller circuits
R410A
Recorded refrigerant
9 / 12
FCU count discrepancy

EQUIPMENT DETAILS

System profile

Yacht
Sunseeker 73 ft motor yacht
Chiller
Dometic chilled-water system
Chiller quantity
3 circuits
Reported capacity
100,000+ BTU; source does not state total or per unit
Refrigerant
R410A recorded for all three chillers
Fan-coil units
Header cites 9 FCUs; room schedule describes 12, including one not inspected

INSPECTION SCOPE

What was checked

  1. 01Visual and operational review of three chiller circuits
  2. 02Leak evidence, pressure indication and saltwater contamination
  3. 03Seawater and freshwater pumps, hoses, clamps and leakage points
  4. 04Accessible fan-coil units, filters, coils, blowers and airflow

FIELD EVIDENCE

What the inspection showed

  • Salt deposits and corrosion extended across multiple independent components.
  • Marine growth in the condenser circuit reduced heat-transfer capability.
  • Two circuits showed very low recorded pressure and required controlled leak testing.
  • Air-side fouling and evaporator corrosion independently explained weak airflow and poor cooling.

PUBLISHED REPORT

Read the complete case study

Preview the report below, or open it in a dedicated browser tab for a full-size display with the PDF controls.

Your browser cannot display the embedded report. Open the PDF in a new tab.